After cleaning out the paint from the threads of the subframe mountings I installed them to the chassis rail and installed the subframe.
I had already checked the underside of the subframe and identified a couple of small areas on the right side where I the outer layer of steel was bulging, so intended to investigate.
I cut the outer layer off, de-rusted and acid cleaned the inner layers, of which these two small areas came up very well.
WP_20260713_002.jpg
on the left side there was a third area, which I hadn't noticed originally, but had more internal rust packing and after chipping away at it showed a small hole in the upper layer.
This was really awkward to deal with as access with the trailing arm still fitted was very tight.
Using a tungsten burr via the outer pocket, I cleaned the inner layer, cut a piece of steel and managed to weld it in. The welding is far from neat, as I couldn't see past the welding torch, but I did manage to weld the patch in from both sides.
I should probably have cut a larger pocket in the outer layer to give better access to the internal layer.
The outer layer cut off, showing the rust packing, and after welding and a coat of primer.
WP_20260713_001.jpg
WP_20260713_004.jpg
WP_20260713_007.jpg
I considered removing the suspension ram and trailing arm, but due quite a bit more dismantling and the risk of the Arb bolt threads stripping, decided I could just gain enough access without.
I had pulled the R clip out of the arm and thought it was a good time to add copper-slip to prevent seizure at a later date. These clips are often seized into the arm so much they snap off when removal is attempted, preventing the suspension leg connection being removed from the arm.
WP_20260713_008.jpg
WP_20260713_010.jpg